Capacity of the hatchery –Hatching units of 7,500 egg setter and 2500 Hatcher capacity
Project cost & subsidy-
Project cost- Rs6600.0/-
Subsidy 40% of project cost- Rs.2.64 lakh
Release of subsidy- Release of subsidy- Subsidy will be released in three phases through DBT. 40% subsidy will be released after construction of house & another 40% subsidy will be released after installation of machinery. Third phages of 20% will be released after incubation of egg.
ELIGIBILITY :- Individual farmer/ entrepreneur
Documents required-
1.Identification Proof (Aadhaar Card).
2.Land Document / Lease Deed (Photocopy).
3.60% of Project Cost to be Self-Financed / Bank Loan.
4.If Bank Loan, Consent Letter from Bank.
5.Photocopy of bank passbook showing A/C No. with IFS Code for DBT
Components of the project- | Cost in Rs. |
Construction of hatchery Room Room Size – 20’ x 15’
Varanda – 20’ x 5’ (Asbestos Roofing With Ceiling, Damp Proof Flooring)400 sq.ft@ 400/sqft. |
160000 |
Construction of washing tank with
drainage facility within the hatching room |
5000 |
Cost of dug well, overhead tank of 500 liter capacity, 0.5 HP pump & pipeline | 25000 |
Electrification & electrical fittings | 10000 |
DG set 240 volt | 42000 |
Cost of 7500 capacity Incubator and 2500 capacity hatcher | 2,69,000 |
Installation & contingency | 14000 |
Capital expenditure | 525000 |
Cost of 7500 LIT birds hatching eggs including transportation @Rs17/ per egg | 1,27,500 |
Cost of 60 liter diesel | 6000 |
Contingency | 1500 |
Total recurring expenditure | 135000 |
Total project cost | 660000 |
Scheme- State plan of Odisha government
Jurisdiction of scheme- All over Odisha
How to Apply- beneficiary can submit Application with document at the office of Block veterinary officer
Or Apply online & upload document in website https://sugam.odisha.gov.in/
Or can apply at common service center (CSC)